Machine Recycling Discussion and Moderated Newsgroup   >   Parts Machines   >   Steam Powered   >   New pipe fabrication package 1/2" - 2", fits ridgid 300

New pipe fabrication package 1/2" - 2", fits ridgid 300


YOU'VE HIT THE BONANZA, THE JACKPOT OF SAVINGS WITH OUR NEW IN BOX, PIPE FABRICATION KIT. HERE IS ALL THAT YOU GET WITH OUR FAB KIT:
NEW PT BRAND THREADING MACHINE, COMPLETE (Picture 2):
A NEW, GENUINE RIDGID (811A) Diehead!
A NEW SET OF GENUINE RIDGID 1/2"- 3/4" AND 1"-2 HSS Dies!
NEW PT 38 RPM Power Drive with Footswitch
NEW PT Carriage complete, Cutter, Reamer
NEW PT Oiler complete & Stand
NEW PT One Gallon Tuf Cut Dark Threading Oil.
One Year Warranty against Manufacturer's Defects
ALL PARTS OF THE MACHINE ARE INTERCHANGEABLE WITH Ridgid
* FREE, NEW PT 1-1/4 to 12 Portable Roll Groover (Picture 3), includes tool box ($799.00 value) WOW! (See full description in our Groover listings)
* FREE, NEW Splatter Guard ($99.00 value) (Picture 4) Perfect for clean environments, and ease of clean-up
* FREE, NEW Tric Tray ($99.00 value) (Picture 5) to give you a helping hand
* FREE, NEW Transporter ($99.00 value) (Picture 6) to help reduce the strain on your aching back
* FREE, NEW Folding V-Head Pipe Stand ($99.00 value) (Picture 7) another helping hand
* FREE, NEW 2" to 4" Four Wheel Hinged Cutter ($249.00 value) (Picture 8) WOW! Helps with cutting pipe in the air
1 TUBE OF SUPERDOPE, ANAEROBIC THREAD SEALANT, (Picture 12)
1 PINT OF TUF-GLIDE, TEFLON PASTE, (Picture 9)
10 ROLLS OF HIGH DENSITY TEFLON TAPE, (Picture 10)
10 ROLLS OF HIGH DENSITY GAS GRADE TEFLON TAPE, (Picture 11)
* Save over $1000.00 on a 300 Threading Maching as compared to Ridgid Brand (All our threader parts are 100% interchangeable w/Ridgid )
* AND receive over $1300.00 worth of free goods, just for having confidence in us.
1 YEAR WARRANTY AGAINST ANY MANUFACTURER'S DEFECTS!
HOW CAN YOU GO WRONG WITH THIS INCREDIBLE DEAL? OUR BOSS HAS GONE CRAZY! BUT WE ALSO KNOW WE SEEM TO BE IN SOME KIND OF, DARE WE SAY IT, RECESSION? SO WHAT DO WE NEED TO DO? TIGHTEN OUR BELTS, AND LOWER PRICES INSTEAD OF LOOKING FOR A BAILOUT!



New pipe fabrication package 1/2 New pipe fabrication package 1/2 New pipe fabrication package 1/2 New pipe fabrication package 1/2 New pipe fabrication package 1/2 New pipe fabrication package 1/2 New pipe fabrication package 1/2 New pipe fabrication package 1/2 New pipe fabrication package 1/2 New pipe fabrication package 1/2 New pipe fabrication package 1/2 New pipe fabrication package 1/2